Search results for 'news' (26)
an accessible port
Festive opening of extra truck parking spaces at Maasvlakte Plaza
The Maasvlakte Plaza truck stop recently gained another 210 parking spaces. Thanks to this expansion, Maasvlakte Plaza now has 567 spaces, m
an accessible port
Part of Maasvlakte Beach temporarily closed to the public
On 1 September, contractor PUMA will set to work at Maasvlakte 2’s leisure beach, nourishing parts of the beach via sand replenishment.
an accessible port
EU backs construction of Theemsweg route
On 16 July, the EU announced that it was backing the construction of the Theemsweg route to the tune of almost €9 million in additional fund
an accessible port
Start of Calandkanaal trial
Today, 6 April, the Port of Rotterdam Authority will be starting on a new trial in the Europoort’s Calandkanaal fairway. This project will f
digitisation
MASS Port Network established
4 August – the MASS (Maritime Autonomous Surface Ships) Port Network was established in Singapore. The collaboration comprises port authorit
an accessible port
Brexit: what to expect in the port of Rotterdam?
Midnight on 31 December will mark the end of the Brexit transition period in which no customs formalities are required for freight transport
an accessible port
Limited openings at Erasmus Bridge for tall vessels
The Port of Rotterdam Authority, the Municipality of Rotterdam and RET have made agreements regarding limited openings at Erasmus Bridge for
innovation
Testbed for deepening quay walls with the aid of underwater anchor points
The Port of Rotterdam Authority will make the public loading quay at Seinehaven available as a trial location for the testing and developmen
an accessible port
Maaskade reopens for inland shipping
Inland vessels will once again be able to moor along Maaskade on Noordereiland in Rotterdam’s city centre. The Port of Rotterdam Authority h
an accessible port
Successful installation of Rozenburgsesluis railway bridge
This weekend, the 177-metre long railway bridge across Rozenburgsesluis was successfully installed on location. The bridge was correctly pos